APPLICATION OF SUBSECTION (C)

Section 8(c) of Pub. L. 99-495 provided that: "Nothing in this Act [see Short Title of 1986 Amendment note set out under section 791a of this title] shall affect the application of section 30(c) of the Federal Power Act [16 U.S.C. 823a(c)] to any exemption issued after the enactment of this Act (Oct. 16, 1986]."

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 824a-3, 2705 of this title; title 42 section 7178.

§ 823b. Enforcement

(a) Monitoring and investigation

The Commission shall monitor and investigate compliance with each license and permit issued under this subchapter and with each exemption granted from any requirement of this subchapter. The Commission shall conduct such investigations as may be necessary and proper in accordance with this chapter. After notice and opportunity for public hearing, the Commission may issue such orders as necessary to require compliance with the terms and conditions of licenses and permits issued under this subchapter and with the terms and conditions of exemptions granted from any requirement of this subchapter.

(b) Revocation orders

After notice and opportunity for an evidentiary hearing, the Commission may also issue an order revoking any license issued under this subchapter or any exemption granted from any requirement of this subchapter where any licensee or exemptee is found by the Commission:

(1) to have knowingly violated a final order issued under subsection (a) of this section after completion of judicial review (or the opportunity for judicial review); and

(2) to have been given reasonable time to comply fully with such order prior to commencing any revocation proceeding.

In any such proceeding, the order issued under subsection (a) of this section shall be subject to de novo review by the Commission. No order shall be issued under this subsection until after the Commission has taken into consideration the nature and seriousness of the violation and the efforts of the licensee to remedy the violation.

(c) Civil penalty

Any licensee, permittee, or exemptee who violates or fails or refuses to comply with any rule or regulation under this subchapter, any term, or condition of a license, permit, or exemption under this subchapter, or any order issued under subsection (a) of this section shall be subject to a civil penalty in an amount not to exceed $10,000 for each day that such violation or failure or refusal continues. Such penalty shall be assessed by the Commission after notice and opportunity for public hearing. In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation, failure, or refusal and the efforts of the licensee to remedy the violation, failure, or refusal in a timely manner. No civil penalty shall be assessed where revocation is ordered.

(d) Assessment

(1) Before issuing an order assessing a civil penalty against any person under this section, the Commission shall provide to such person notice of the proposed penalty. Such notice shall, except in the case of a violation of a final order issued under subsection (a) of this section, inform such person of his opportunity to elect in writing within 30 days after the date of receipt of such notice to have the procedures of paragraph (3) (in lieu of those of paragraph (2)) apply with respect to such assessment.

(2)(A) In the case of the violation of a final order issued under subsection (a) of this section, or unless an election is made within 30 calendar days after receipt of notice under paragraph (1) to have paragraph (3) apply with respect to such penalty, the Commission shall assess the penalty, by order, after a determination of violation has been made on the record after an opportunity for an agency hearing pursuant to section 554 of title 5 before an administrative law judge appointed under section 3105 of such title 5. Such assessment order shall include the administrative law judge's findings and the basis for such assessment.

(B) Any person against whom a penalty is assessed under this paragraph may, within 60 calendar days after the date of the order of the Commission assessing such penalty, institute an action in the United States court of appeals for the appropriate judicial circuit for judicial review of such order in accordance with chapter 7 of title 5. The court shall have jurisdiction to enter a judgment affirming, modifying, or setting aside in whole or in Part,' the order of the Commission, or the court may remand the proceeding to the Commission for such further action as the court may direct.

(3)(A) In the case of any civil penalty with respect to which the procedures of this paragraph have been elected, the Commission shall promptly assess such penalty, by order, after the date of the receipt of the notice under paragraph (1) of the proposed penalty.

(B) If the civil penalty has not been paid within 60 calendar days after the assessment order has been made under subparagraph (A), the Commission shall institute an action in the

'So in original. Probably should not be capitalized.

appropriate district court of the United States for an order affirming the assessment of the civil penalty. The court shall have authority to review de novo the law and the facts involved, and shall have jurisdiction to enter a judgment enforcing, modifying, and enforcing as so modified, or setting aside in whole or in Part,2 such assessment.

(C) Any election to have this paragraph apply may not be revoked except with the consent of the Commission.

(4) The Commission may compromise, modify, or remit, with or without conditions, any civil penalty which may be imposed under this subsection, taking into consideration the nature and seriousness of the violation and the efforts of the licensee to remedy the violation in a timely manner at any time prior to a final decision by the court of appeals under paragraph (2) or by the district court under paragraph (3).

(5) If any person fails to pay an assessment of a civil penalty after it has become a final and unappealable order under paragraph (2), or after the appropriate district court has entered final judgment in favor of the Commission under paragraph (3), the Commission shall institute an action to recover the amount of such penalty in any appropriate district court of the United States. In such action, the validity and appropriateness of such final assessment order or judgment shall not be subject to review.

(6)(A) Notwithstanding the provisions of title 28 or of this chapter, the Commission may be represented by the general counsel of the Commission (or any attorney or attorneys within the Commission designated by the Chairman) who shall supervise, conduct, and argue any civil litigation to which paragraph (3) of this subsection applies (including any related collection action under paragraph (5)) in a court of the United States or in any other court, except the Supreme Court. However, the Commission or the general counsel shall consult with the Attorney General concerning such litigation, and the Attorney General shall provide, on request, such assistance in the conduct of such litigation as may be appropriate.

(B) The Commission shall be represented by the Attorney General, or the Solicitor General, as appropriate, in actions under this subsection, except to the extent provided in subparagraph (A) of this paragraph.

(June 10, 1920, ch. 285, pt. I, § 31, as added Oct. 16, 1986, Pub. L. 99-495, § 12, 100 Stat. 1255.)

EFFECTIVE DATE

Section applicable to licenses, permits, and exemptions without regard to when issued, see section 18 of Pub. L. 99-495, set out as an Effective Date of 1986 Amendment note under section 797 of this title.

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in section 8250-1 of this title.

2 So in original. Probably should not be capitalized.

SUBCHAPTER II-REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE COMMERCE

SUBCHAPTER REFERRED TO IN OTHER SECTIONS This subchapter is referred to in sections 803, 824a-3 of this title; title 42 section 7172; title 43 section 1761.

§ 824. Declaration of policy; application of subchapter (a) Federal regulation of transmission and sale of electric energy

It is declared that the business of transmitting and selling electric energy for ultimate distribution to the public is affected with a public interest, and that Federal regulation of matters relating to generation to the extent provided in this subchapter and subchapter III of this chapter and of that part of such business which consists of the transmission of electric energy in interstate commerce and the sale of such energy at wholesale in interstate commerce is necessary in the public interest, such Federal regulation, however, to extend only to those matters which are not subject to regulation by the States.

(b) Use or sale of electric energy in interstate com

merce

(1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter.

(2) The provisions of sections 824i, 824j, and 824k of this title shall apply to the entities described in such provisions, and such entities shall be subject to the jurisdiction of the Commission for purposes of carrying out such provisions and for purposes of applying the enforcement authorities of this chapter with respect to such provisions. Compliance with any order of the Commission under the provisions of section 8241 or 824j of this title, shall not make an electric utility or other entity subject to the jurisdiction of the Commission for any purposes other than the purposes specified in the preceding sentence.

(c) Electric energy in interstate commerce

For the purpose of this subchapter, electric energy shall be held to be transmitted in interstate commerce if transmitted from a State and consumed at any point outside thereof; but only insofar as such transmission takes place within the United States.

(d) "Sale of electric energy at wholesale” defined
The term "sale of electric energy at whole-
sale" when used in this subchapter, means a
sale of electric energy to any person for resale.
(e) "Public utility" defined

The term "public utility" when used in this
subchapter and subchapter III of this chapter
means any person who owns or operates facili-
ties subject to the jurisdiction of the Commis-
sion under this subchapter (other than facili-
ties subject to such jurisdiction solely by reason
of section 8241, 824j, or 824k of this title).
(f) United States, State, political subdivision of a
State, or agency or instrumentality thereof
exempt

No provision in this subchapter shall apply to, or be deemed to include, the United States, a State or any political subdivision of a State, or any agency, authority, or instrumentality of any one or more of the foregoing, or any corporation which is wholly owned, directly or indirectly, by any one or more of the foregoing, or any officer, agent, or employee of any of the foregoing acting as such in the course of his official duty, unless such provision makes specific reference thereto.

(g) Books and records

(1) Upon written order of a State commission, a State commission may examine the books, accounts, memoranda, contracts, and records of

(A) an electric utility company subject to its regulatory authority under State law,

(B) any exempt wholesale generator selling energy at wholesale to such electric utility, and

(C) any electric utility company, or holding company thereof, which is an associate company or affiliate of an exempt wholesale generator which sells electric energy to an electric utility company referred to in subparagraph (A),

wherever located, if such examination is required for the effective discharge of the State commission's regulatory responsibilities affecting the provision of electric service.

(2) Where a State commission issues an order pursuant to paragraph (1), the State commission shall not publicly disclose trade secrets or sensitive commercial information.

(3) Any United States district court located in the State in which the State commission referred to in paragraph (1) is located shall have jurisdiction to enforce compliance with this subsection.

(4) Nothing in this section shall

(A) preempt applicable State law concerning the provision of records and other information; or

(B) in any way limit rights to obtain records and other information under Federal law, contracts, or otherwise.

(5) As used in this subsection the terms "affiliate", "associate company", "electric utility company", "holding company", "subsidiary company", and "exempt wholesale generator" shall have the same meaning as when used in the Public Utility Holding Company Act of 1935 [15 U.S.C. 79 et seq.).

(June 10, 1920, ch. 285, pt. II, § 201, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 847; amended Nov. 9, 1978, Pub. L. 95-617, title II, § 204(b), 92 Stat. 3140; Oct. 24, 1992, Pub. L. 102-486, title VII, § 714, 106 Stat. 2911.)

REFERENCES IN TEXT

The Public Utility Holding Company Act of 1935, referred to in subsec. (g)(5), is title I of act Aug. 26, 1935, ch. 687, 49 Stat. 838, as amended, which is classified generally to chapter 2C (§ 79 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see section 79 of Title 15 and Tables.

AMENDMENTS

1992-Subsec. (g). Pub. L. 102-486 added subsec. (g). 1978-Subsec. (b). Pub. L. 95-617, § 204(b)(1), designated existing provisions as par. (1), inserted "except as provided in paragraph (2)" after “in interstate commerce, but", and added par. (2).

Subsec. (e). Pub. L. 95-617, § 204(b)(2), inserted "(other than facilities subject to such jurisdiction solely by reason of section 8241, 824j, or 824k of this title)" after "under this subchapter".

TRANSFER OF FUNCTIONS

Federal Power Commission terminated and its functions with regard to establishment, review, and enforcement of rates and charges for transmission or sale of electric energy, including determinations on construction work in progress under this subchapter transferred to Federal Energy Regulatory Commission by sections 7172(a)(1)(B) and 7293 of Title 42, The Public Health and Welfare.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

STATE AUTHORITIES; CONSTRUCTION

Nothing in amendment by Pub. L. 102-486 to be construed as affecting or intending to affect, or in any way to interfere with, authority of any State or local government relating to environmental protection or siting of facilities, see section 731 of Pub. L. 102-486, set out as a note under section 79 of Title 15, Commerce and Trade.

PRIOR ACTIONS; EFFECT ON OTHER AUTHORITIES Section 214 of Pub. L. 95-617 provided that: "(a) PRIOR ACTIONS.-No provision of this title [enacting sections 823a, 824i to 824k, 824a-1 to 824a-3 and 825q-1 of this title, amending sections 796, 824, 824a, 824d, and 825d of this title and enacting provisions set out as notes under sections 824a, 824d, and 825d of this title or of any amendment made by this title shall apply to, or affect, any action taken by the Commission before the date of the enactment of this Act [Nov. 9, 1978).

"(b) OTHER AUTHORITIES.-No provision of this title [enacting sections 823a, 824i to 824k, 824a-1 to 824a-3 and 825q-1 of this title, amending sections 796, 824, 824a, 824d, and 825d of this title and enacting provisions set out as notes under sections 824a, 824d, and 825d of this title] or of any amendment made by this title shall limit, impair or otherwise affect any authority of the Commission or any other agency or instrumentality of the United States under any other provision of law except as specifically provided in this title."

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in section 839e of this title; title 15 section 79z-5a.

§ 824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries

(a) Regional districts; establishment; notice to State commissions

For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations.

(b) Sale or exchange of energy; establishing physical connections

Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them. (c) Temporary connection and exchange of facilities during emergency

During the continuance of any war in which the United States is engaged, or whenever the

Commission determines that an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, or other causes, the Commission shall have authority, either upon its own motion or upon complaint, with or without notice, hearing, or report, to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the Commission, after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party. (d) Temporary connection during emergency by persons without jurisdiction of Commission

During the continuance of any emergency requiring immediate action, any person engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder. (e) Transmission of electric energy to foreign country

After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate.

(f) Transmission or sale at wholesale of electric energy; regulation

The ownership or operation of facilities for the transmission or sale at wholesale of electric energy which is (a) generated within a State and transmitted from the State across an international boundary and not thereafter transmitted into any other State, or (b) generated in a foreign country and transmitted across an international boundary into a State and not thereafter transmitted into any other State, shall not make a person a public utility subject to regulation as such under other provisions of this subchapter. The State within which any such facilities are located may regulate any such transaction insofar as such State regulation does not conflict with the exercise of the Commission's powers under or relating to subsection (e) of this section.

(g) Continuance of service

In order to insure continuity of service to customers of public utilities, the Commission shall require, by rule, each public utility to

(1) report promptly to the Commission and any appropriate State regulatory authorities any anticipated shortage of electric energy or capacity which would affect such utility's capability of serving its wholesale customers,

(2) submit to the Commission, and to any appropriate State regulatory authority, and periodically revise, contingency plans respecting

(A) shortages of electric energy or capacity, and

(B) circumstances which may result in such shortages, and

(3) accommodate any such shortages or circumstances in a manner which shall

(A) give due consideration to the public health, safety, and welfare, and

(B) provide that all persons served directly or indirectly by such public utility will be treated, without undue prejudice or disadvantage.

(June 10, 1920, ch. 285, pt. II, § 202, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 848; amended Aug. 7, 1953, ch. 343, 67 Stat. 461; Nov. 9, 1978, Pub. L. 95-617, title II, § 206(a), 92 Stat. 3141.)

AMENDMENTS

1978-Subsec. (g). Pub. L. 95-617 added subsec. (g). 1953-Subsec. (f). Act Aug. 7, 1953, added subsec. (f).

EFFECTIVE DATE OF 1978 AmendmenT

Section 206(b) of Pub. L. 95-617 provided that: "The amendment made by subsection (a) [adding subsec. (g) of this section] shall not affect any proceeding of the Commission pending on the date of the enactment of this Act [Nov. 9, 1978] or any case pending on such date respecting a proceeding of the Commission."

TRANSFER OF FUNCTIONS

Federal Power Commission terminated and its functions with regard to establishment, review, and enforcement of rates and charges for transmission or sale of electric energy, including determinations on construction work in progress under this subchapter and interconnection, under this section, of facilities for generation, transmission, and sale of electric energy, other than emergency interconnection, trans

ferred to Federal Energy Regulatory Commission by sections 7172(a)(1)(B) and 7293 of Title 42, The Public Health and Welfare.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15. F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

[blocks in formation]

The Commission may, on its own motion, and shall, on application of any person or governmental entity, after public notice and notice to the Governor of the affected State and after affording an opportunity for public hearing, exempt electric utilities, in whole or in part, from any provision of State law, or from any State rule or regulation, which prohibits or prevents the voluntary coordination of electric utilities, including any agreement for central dispatch, if the Commission determines that such voluntary coordination is designed to obtain economical utilization of facilities and resources in any area. No such exemption may be granted if the Commission finds that such provision of State law, or rule or regulation

(1) is required by any authority of Federal law, or

(2) is designed to protect public health, safety, or welfare, or the environment or conserve energy or is designed to mitigate the effects of emergencies resulting from fuel shortages.

(b) Pooling study

(1) The Commission, in consultation with the reliability councils established under section 202(a) of the Federal Power Act [16 U.S.C. 824a), the Secretary, and the electric utility industry shall study the opportunities for

(A) conservation of energy,

(B) optimization in the efficiency of use of facilities and resources, and

(C) increased reliability,

through pooling arrangements. Not later than 18 months after November 9, 1978, the Commis