Solving Corrosion Problems of Bridge Surfaces Could Save Billions: Report to the Congress

Coperta unu
General Accounting Office, 1979 - 21 pagini

Din interiorul cărții

Pagini selectate

Termeni și expresii frecvente

Pasaje populare

Pagina 19 - Montana, Nebraska, Nevada, New Jersey, New York, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania (for payment of temporary indebtedness), South Carolina, South Dakota, Tennessee, Texas, Utah, Virginia, Washington, and Wyoming.
Pagina i - Administration has found that some unprotected bridge decks require major repair within 5 to 10 years, and often must be replaced after 15 years of service. The major cause of this early deterioration is corrosion of the reinforcing steel bars in the bridge deck, brought about by chloride chemicals which are used to melt snow.
Pagina 3 - ... Various Parameters of Design and Construction." The purpose of this investigation is to provide administrators and designers with factual data on which to base decisions as to the type of protection to provide for bridge decks constructed in corrosive environments. The specific study objective is: to determine the relative time-to-corrosion of reinforcing steel embedded in concrete slabs, fabricated from various mix designs and construction procedures, when the slabs are subjected to periodic...
Pagina 7 - Administration study indicated that, if the 29,000 interstate bridge decks requiring minor repair today were neglected to the extent that they require moderate repair, the current repair cost of about $600 million would increase by an additional $4.4 billion. These estimates are in 1975 dollars.
Pagina ii - PSAD-79-10 later. The potential benefit/cost ratio of repairing and protecting an existing bridge deck needing only minor repair versus completely replacing the deck at a later date is 2.75 to 1.
Pagina i - Tear ShMl. Upon removal, the report cover date should be noted hereon PSAD-79-10 later.
Pagina 1 - Administration found that unprotected bridge decks receiving deicing chemicals require major repair within 5 to 10 years, and often must be replaced after only 15 years of service.
Pagina 8 - State funds is a major reason why bridge decks still in good condition are not being protected by a majority of the 32 States with a serious bridge deterioration problem.
Pagina 1 - Transportation officials requested the Transportation Research Board of the National Academy of Sciences to prepare a state-of-the-art report on the concrete bridge deck deterioration problem.