Solving Corrosion Problems of Bridge Surfaces Could Save Billions: Report to the CongressGeneral Accounting Office, 1979 - 21 pagini |
Din interiorul cărții
Rezultatele 1 - 5 din 6
Pagina i
... improved , their currently repairable bridge decks will continue to deteriorate , and eventually require complete replacement at a much higher cost . For ex- ample , a Federal Highway Administration re- port points out that , if 29,000 ...
... improved , their currently repairable bridge decks will continue to deteriorate , and eventually require complete replacement at a much higher cost . For ex- ample , a Federal Highway Administration re- port points out that , if 29,000 ...
Pagina iii
... improve the technology evaluation process , GAO recommends that the Secretary of Transpor- tation establish a formal long - term data col- lection and evaluation system for bridge deck protective systems . AGENCY COMMENTS The Department ...
... improve the technology evaluation process , GAO recommends that the Secretary of Transpor- tation establish a formal long - term data col- lection and evaluation system for bridge deck protective systems . AGENCY COMMENTS The Department ...
Pagina 1
... improve winter traffic condi- tions . With repeated applications , the chlorides penetrate the concrete surface , and eventually reach the reinforcing steel . Corrosion of the steel will occur when the chloride interacts with the ...
... improve winter traffic condi- tions . With repeated applications , the chlorides penetrate the concrete surface , and eventually reach the reinforcing steel . Corrosion of the steel will occur when the chloride interacts with the ...
Pagina 7
... improvement can be expected in the future as shown below in table 2 . Table 2 Percentage of bridge decks with protective systems 0 11 21 31 - - - - - 10 20 30 40 50 41 over 50 Total 1977 situation ( No. of States ) 1980 situation ( No ...
... improvement can be expected in the future as shown below in table 2 . Table 2 Percentage of bridge decks with protective systems 0 11 21 31 - - - - - 10 20 30 40 50 41 over 50 Total 1977 situation ( No. of States ) 1980 situation ( No ...
Pagina 17
... improve its technology evaluation process , we recom- mend that the Secretary establish a formal long - term data collection and evaluation system for bridge deck protective systems . AGENCY COMMENTS In a letter dated November 14 , 1978 ...
... improve its technology evaluation process , we recom- mend that the Secretary establish a formal long - term data collection and evaluation system for bridge deck protective systems . AGENCY COMMENTS In a letter dated November 14 , 1978 ...
Termeni și expresii frecvente
AGENCY COMMENTS Assistant Secretary better identify bridge bridge deck deterioration bridge deck problem bridge deck protective bridge decks needing bridge decks requiring BRIDGE DETERIORATION PROBLEMS bridge repair bridges so deteriorated chloride-contaminated bridge decks collection and evaluation construction CONTAMINATED BRIDGE DECKS contaminated decks cost COST-EFFECTIVE METHOD data retrieval program dated November 14 deck protective systems Department of Transportation District of Columbia eral Eschwege Evaluation Program existing bridge decks Federal Highway Administration Federal Highway Administration's Federal-aid system bridge fiscal year 1979 formal long-term data funds HEAVILY CONTAMINATED BRIDGE Highway Administration officials Highway Administration recognizes Highway officials identify bridge decks interstate bridge decks letter dated November long-term data collection Maryland minor repair versus number of bridges performance data portation potential benefit/cost ratio questionnaire rate of corrosion salt applications save billions Secretary for Administration SECRETARY OF TRANSPORTATION system bridge decks systems on bridge techniques tective systems U.S. General Accounting unprotected bridge decks
Pasaje populare
Pagina 19 - Montana, Nebraska, Nevada, New Jersey, New York, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania (for payment of temporary indebtedness), South Carolina, South Dakota, Tennessee, Texas, Utah, Virginia, Washington, and Wyoming.
Pagina i - Administration has found that some unprotected bridge decks require major repair within 5 to 10 years, and often must be replaced after 15 years of service. The major cause of this early deterioration is corrosion of the reinforcing steel bars in the bridge deck, brought about by chloride chemicals which are used to melt snow.
Pagina 3 - ... Various Parameters of Design and Construction." The purpose of this investigation is to provide administrators and designers with factual data on which to base decisions as to the type of protection to provide for bridge decks constructed in corrosive environments. The specific study objective is: to determine the relative time-to-corrosion of reinforcing steel embedded in concrete slabs, fabricated from various mix designs and construction procedures, when the slabs are subjected to periodic...
Pagina 7 - Administration study indicated that, if the 29,000 interstate bridge decks requiring minor repair today were neglected to the extent that they require moderate repair, the current repair cost of about $600 million would increase by an additional $4.4 billion. These estimates are in 1975 dollars.
Pagina ii - PSAD-79-10 later. The potential benefit/cost ratio of repairing and protecting an existing bridge deck needing only minor repair versus completely replacing the deck at a later date is 2.75 to 1.
Pagina i - Tear ShMl. Upon removal, the report cover date should be noted hereon PSAD-79-10 later.
Pagina 1 - Administration found that unprotected bridge decks receiving deicing chemicals require major repair within 5 to 10 years, and often must be replaced after only 15 years of service.
Pagina 8 - State funds is a major reason why bridge decks still in good condition are not being protected by a majority of the 32 States with a serious bridge deterioration problem.
Pagina 1 - Transportation officials requested the Transportation Research Board of the National Academy of Sciences to prepare a state-of-the-art report on the concrete bridge deck deterioration problem.